Title

Northfield Mountain Pumped Storage Hydroelectric Project Anadromous Fish Study: Part I

Authors

J B. Layzer

Publication Date

1976

Notes

Full title of Part I: Behavior of ultrasonic tagged adult American shad, Alosa sapidissima, in the Connecticut River with particular reference to the Northfield Mountain Pumpede Storage Hydroelectric Project and the Vernon Dam 1973-1976. A report to Northeast Utilities Service Company.

Keywords

adult, behavior, Connecticut River, hydroelectric, Northeast Utilities, Northfield Mountain, pumped storage, shad, Vernon Station, anadromous fish, American shad, Alosa sapidissima, Holyoke, Turners Falls, Massachusetts, mortality, pool, handling, tailrace

This document is currently not available here.

COinS