Submissions from 1987
An Evaluation of the Effectiveness of Fish Bypass Modifications of the Log and Ice Sluiceway at Bellows Falls Station: Work Plan, International Science & Technology I
Hydroacoustic Evaluation of the Spill Program for Fish Passage at John Day Dam in 1987: Final Report, L Johnson and R Wright
Radio Telemetric Investigation of Downstream Passage of Atlantic Salmon Smolts at Bellows Falls Station, J M. Mudre and W P. Saunders
A Study to Determine the Biological Feasibility of a New Fish Tagging System, 1986-1987, E F. Prentice, T A. Flagg, and S McCutcheon
Assessment of the Frequency of Worst Case Flow Conditions During Downstream Migration of Salmon Smolts at Bellows Falls Dam, W P. Saunders
Fish Passes: A Study and Laboratory Investigation, K E. Taylor
Submissions from 1986
New Concepts in Fish Ladder Design: Final Project Report Part 2 of 4, R G. Aaserude and J F. Orsborn
Five Downstream Fish Passage Facilities in Nova Scotia and New Brunswick, Canada, V Conrad
Downstream Fish Passage Needs on the Connecticut River, Downstream Fish Passage Subcommittee
A Study of Upstream Passage of Atlantic Salmon at Weldon Dam: 1986 Report, Great Northern Paper
Connecticut River Anadromous Fish Investigations: Project Performance Report 1986, S Henry and J A. O'Leary
Evaluation of Lower Umatilla River Channel Modifications Below Three Mile Dam, 1985, A A. Nigro and D L. Ward
New Concepts in Fish Ladder Design. Final Project Report Part 1 of 4 (Summary), J F. Orsborn
A Study to Determine the Biological Feasibility of a New Fish Tagging System, 1985-1986, E F. Prentice, D L. Park, T A. Flagg, and S McCutcheon
Experimental Study of Culvert Fishways, N Rajaratnam, M A. Fairbairn, and C Katopodis
Channel Modification for Fish Passage on Umatilla River: Supplement to Final Report 1985, W L. Sanguine
Smolt Condition and Timing of Arrival at Lower Granite Reservoir, R J. Scully and E W. Buettner
Hydroacoustic Assessment of Downstream Migrating Salmonids at the Dalles Dam in Spring and Summer 1985, T W. Steig and W R. Johnson
Juvenile Radio-Tag Study: Lower Granite Dam, L C. Stuehrenberg, A E. Giorgi, C W. Sims, J Ramonda-Powell, and J Wilson
Fish Ladder Research in Queensland, C H. Teoh
Submissions from 1985
Results of Laboratory and Field Research on New Concepts in Weir and Pool Fishways. Final Project Report Part 2 of 4, R G. Aaserude and J F. Orsborn
Biological Evaluation of a Ristroph Screen at Indian Point Unit 2, Consolidated Edison Company of New York
A study of upstream passage of Atlantic salmon at Weldon Dam: 1985 report, Great Northern Paper
Connecticut River Anadromous Fish Investigations: Project Performance Report 1985, S Henry and J A. O'Leary
Hydroacoustic Assessment of Downstream Migrating Salmonids at Lower Monumental Dam in Spring 1985, L Johnson, A Murphy, and C Rawlinson
Radio-Tracking Studies of Adult Chinook Salmon and Steelhead to Determine the Effect of 'Zero' River Flow During Water Storage at Little Goose Dam on the Lower Snake River, K Liscom, L Stuehrenberg, and F Ossiander
Evaluation of Lower Umatilla River Channel Modifications Below Three Mile Dam, 1984, A A. Nigro and D L. Ward
Fishways - An Assessment of Their Development and Design: Final Project Report Part 3 of 4, J F. Orsborn and P D. Powers
Engineering report on enhancement of fish passage in Whitemud River, F Penner F;Oshoway R; and R Oshoway
Analysis of Barriers to Upstream Fish Migration: Final Project Report Part 4 of 4, P D. Powers
A Study to Determine the Biological Feasibility of a New Fish Tagging System, E F. Prentice, C W. Sims, and D L. Park
Submissions from 1984
Juvenile Fish Screen Design Criteria: A Review of the Objectives and Scientific Data Base, J A. Easterbrooks
Smolt Passage Behavior and Flow-Net Relationships in the Forebay of John Day Dam, A E. Giorgi and L C. Stuehrenberg
Weldon Dam radio telemetry studies: Upstream Atlantic salmon passage study, 1984 report (Mattaceunk Project - FERC No. 2520), Great Northern Paper
Weldon Dam upstream Atlantic salmon passage study: 1984 report (Mattaceunk Project - FERC No. 2520), Great Northern Paper
Connecticut River Anadromous Fish Investigations: Project Performance Report 1984, S Henry and R J. Krska Jr.
Similarity of Scale Models of Denil Fishways, C Katopodis C;Rajaratnam N; and N Rajaratnam
W. Darcy McKeough Floodway Fish Passage, Ontario Ministry of Natural Resources
Hydroacoustic Monitoring of Downstream Migrant Salmon and Steelhead at Wells Dam in Spring 1984, G A. Raemhild, G E. Johnson, and C M. Sulllivan
Evaluations of Adult Fish Passage at Ice Harbor and Lower Monumental Dams, 1982., A R. Turner, J R. Kuskie Jr., and K E. Kostow
Evaluation of Adult Fish Passage at Bonneville Lock and Dam in 1983, A R. Turner Jr., D M. Shew, L M. Beck, R J. Stansell, and R D. Peters
Sixth Progress Report: Fish Passage Development and Evaluation Program 1979-1983, U.S.Army Corps of Engineers
Submissions from 1983
Connecticut River Basin Anadromous Fish Studies: 1982 Project Performance Report, R J. Krska and B Kynard
A Review of Several Fish Culture Degassing Systems, T W. McLaughlin and L C. Busch
Studies of Downrunning Adult American Shad in the Holyoke Dam Canal System -1982 (Progress Report to Northeast Utilities Service Company), J O'Leary and B Kynard
Evaluation of Adult Fish Passage at Bonneville Dam, 1982., C V. Ross
Evaluation of Adult Fish Passage at Little Goose and Lower Granite Dams, 1981, A R. Turner, J R. Kuskie Jr., and K E. Kostow
Submissions from 1982
A Passive Fish Screen for Hydroelectric Turbines, G J. Eicher
Use of Filtered Mercury Vapour Lights in Association with a Modified Fish Handling Pump at Nanticoke TGS, G T. Haymes
John Day Dam Powerhouse: Fish Collection System Evaluation., G A. Johnson, J R. Kuskie Jr., W T. Nagy, and K L. Liscom
Generic Concerns with Hydropower Development in New York Division of Fish and Wildlife New York State Department of Environmental Conservation., W E. Knapp WE;
Connecticut River Basin Anadromous Fish Studies: 1981 Project Performance Report, R J. Krska and B Kynard
Submissions from 1981
Updated Compendium on the Success of Passage of Small Fish Through Turbines, M C. Bell, A C. DeLacy, G J. Paulik, K J. Bruya, and C T. Scott
Workshop on Riverine Water Quality Modeling., L S. Johnson, D E. Ford, and D L. Robey
Hydropower in the 1980's- A Prescription for Success., W E. Knapp WE;
Connecticut River Basin Anadromous Fish Studies: 1980 Performance Report, C M. Moffitt and B Kynard
Connecticut River Basin Fish Passage, Flow, and Habitat Alteration Considerations in Relation to Anadramous Fish Restoration, Technical Committee for Fisheries Management of the Connecticut River
North Pacific Division Fish Facilities Manual, U.S.Army Corps of Engineers
Submissions from 1980
Investigation of Snake Island Fishway at Little Falls Dam, Potomac River Maryland - Virginia, P J. Dalley
Progress Report on The Use of Underwater Electric Fields to Control the Movements fo Migratory Fish at Holyoke, Massachusetts, R B. Northrop and J O'Leary
2nd Powerhouse Fish Facilities Design Memorandum No. 9 Supplement No. 5, U.S.Army Corps of Engineers
Submissions from 1979
Fishway inventory for Prince Edward Island, V Conrad and C J. Pellerin
Transport of Live Fish, S K. Johnson
The Bonneville Lock and Dam Powerhouse Adult Fish Collection System Evaluation: 1976-1978, U.S.Army Corps of Engineers
Submissions from 1978
Instream Flow Methodologies for Regional and National Assessments, K Bayha
Hydraulic Properties of Concrete Pipe: Pipe sizes diameters 100 millimeters through 3000 millimeters, SI Metric
Submissions from 1976
Northfield Mountain Pumped Storage Hydroelectric Project Resident Fish Study: Progress Report No. 5, J J. Jonasch and S M. Shapiro
Submissions from 1975
Prediction of Dissolved Gas at Hydraulic Structures, P L. Johnson
Fish Diversion Studies for Screenwell Structures: Angled Screen, J Larsen
Northfield Mountain Pumped Storage Hydroelectric Project Resident Fish Study: Progress Report No. 4, S M. Shapiro and J J. Jonasch
Submissions from 1974
Northfield Mountain Pumped Storage Hydroelectric Project Resident Fish Study: Progress Report No. 3, W E. Brigham and J J. Jonasch
Fish Migration and Fish Passage: A Practical Guide to Solving Fish Passage Problems, W A. Evans and F B. Johnston
Fishway with a controlled flow and method of calculation, P R. Khlopenkov PR;
Northfield Mountain Pumped Storage Hydroelectric Project Anadromous Fish Study, 1973: Progress Report, J B. Layzer
Survival of Coho Salmon Fingerlings Passing Through a Perforated Bulkhead in an Empty Turbine Bay and Through Flow Deflectors (With and Without Dentates) on Spillway at Lower Monumental Dam, Snake River, April - May 1973, C W. Long and F J. Ossiander
Submissions from 1973
Northfield Mountain Pumped Storage Hydroelectric Project Resident Fish Study: Progress Report No. 2, W E. Brigham and J J. Jonasch
Submissions from 1972
A Compendium On The Survival of Fish Passing Through Spillways and Conduits, M C. Bell and A C. DeLacy
Northfield Mountain Pumped Storage Hydroelectric Project Resident Fish Study: Progress Report No. 1, W E. Brigham and J J. Jonasch
The downstream migrant fish problems associated with hydroelectric facilities on the Exploits River, Newfoundland, M K. Farwell
Fish passage and culvert installations, S Gebhards and J Fisher
Effects of Hydraulic Shearing Actions on Juvenile Salmon: Summary Report, A B. Groves
Fingerling Fish Research, High-Velocity Flow Through Four-Inch Nozzle, R L. Johnson
Submissions from 1971
Submissions from 1970
Fingerling Fish Mortalities at 57.5 FPS, R L. Johnson
Fingerling Fish Research Effect of Mortality of 67 FPS Velocity, R L. Johnson
Fish Passage Through Highway Culverts: A Field Evaluation, T J. McClellan
Engineering aspects of Mactaquac fish handling facilities, D C. Riley DC;
Submissions from 1969
Directional responses in herring to sound and noise stimuli, K Osen K;
Submissions from 1968
Suitability of the Susquehanna River for Restoration of Shad, F T. Carlson
Efficiency Tests of the Primary Louver System, Tracy Fish Screen 1966-1967, R J. Hallock, R A. Iselin, and D H. Fry
Avoidance of acoustic stimuli by the herring, G Hering G;
Submissions from 1967
Research on Fingerling Mortality in Kaplan Turbines, C W. Long and W M. Marquette
Submissions from 1965
Comprehensive Water Resource Investigations, Connecticut River Basin: List of River Mileage Designations, U.S.Army Engineer Division NE