Publication

Case Study: Determining Instream Flow Requirements for the Arbuckle Mountain Hydroelectric Project

Citations
Altmetric:
Abstract
This paper describes the use of the Instream Flow Incremental Methodology to determine instream flow requirements for a small hydroelectric project in California. The negotiated stream flow schedule is significantly different from that which would be required using only fish habitat/discharge relationships. Other environmental factors considered in this analysis include: flow duration, flow occurrence frequency, flow volume, and water temperature.
Type
article
article
Date
1985
Publisher
American Fisheries Society
Degree
Advisors
License
License
Research Projects
Organizational Units
Journal Issue
Embargo Lift Date
DOI
Publisher Version
Embedded videos
Related Item(s)