Publication

Upstream migration of two pre-spawning shortnose sturgeon passed upstream of Pinopolis Dam, Cooper River, South Carolina

Citations
Altmetric:
Abstract
Two shortnose sturgeon were artificially passed above the Pinopolis Lock and Dam into the Santee-Cooper Lakes in order to simulate the use of a fish-passage mechanism. Movement patterns and spawning behavior were studied to determine the potential success of future shortnose sturgeon migrations if and when a fish-migration bypass structure is installed. In addition to movement patterns, water temperature was monitored in areas that shortnose sturgeons utilized. Shortnose sturgeon migrated through a large static system to a known shortnose sturgeon spawning area more than 160 km upstream where water temperatures were consistent with known shortnose sturgeon spawning temperatures. No specific movement patterns in the reservoir system were recorded during downstream migrations.
Type
article
article
Date
2006-01-01
Publisher
Degree
Advisors
License
License
Research Projects
Organizational Units
Journal Issue
Embargo Lift Date
DOI
Publisher Version
Embedded videos
Collections
Related Item(s)