•  
  •  
 

Authors

Philip Koske

Publication Date

2013

Abstract

The 3.1-mile (4.99-kilometer) linear Lafitte Greenway, one of the first revitalization projects since Hurricane Katrina (2005), is designed to become a vibrant bicycle and pedestrian transportation corridor linking users to the world-famous French Quarter and central business district. As an emerging city, New Orleans generally developed sections of swamp land starting near the French Quarter and growing outward in most directions. The resulting transect of neighborhoods with access to the Lafitte Greenway begins with areas associated with early development, such as Fauborg Tremé and Bayou St. John, to 20th Century development found within the Navarre and Mid City Neighborhoods. In all, the Greenway directly impacts nine distinct neighborhoods with several documented sub-districts, including the Tremé neighborhood which has the distinction of being the first freed black neighborhood in America, a hot spot in the southern civil rights movement, and the starting point of a great jazz tradition.

A multi-disciplinary team of landscape architects, civil engineers, ecologists, economists, crime prevention experts, park management consultants, and public engagement specialists incorporated public input, synthesized measurable objectives, and worked across a range of scales to plan and design one of the most important planned public spaces since the hurricane. The project began in spring 2009 and is scheduled to begin the first phase of construction in the fall of 2013.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.