Start Date
10-6-2014 2:10 PM
End Date
10-6-2014 2:30 PM
COinS
Jun 10th, 2:10 PM
Jun 10th, 2:30 PM
Presentation the history of fish ladder construction in România and one concrete frontal solution that can achieve longitudinal connectivity of the Crişul Repede River. A case study