Title

Downstream Migration of Atlantic Salmon Smolts at PSNH Hydroelectric Stations on the Merrimack and Pemigewasset Rivers

Authors

W P. Saunders

Date

1992

Keywords

Atlantic salmon, bypass, downstream fish passage, downstream migration, hydroelectric, hydroelectric plants, Merrimack River, migration, Pemigewasset River, radio tags, radio telemetry, salmon, smolt, telemetry

Summary

None supplied. From summary: During the spring of 1989 nd 1990 a radio telemetry study of downstream migration of Atlantic salmon smolts past five Public Service of New Hampshire (PSNH) hydroelectric facilites was conducted. The hydroelectrric facility sites are located within a 91 km segment of the mainstem of the Merrimack and Pemigewasset Rivers in New Hampshire (the Pemigewasset is the headwater tributary to the Merrimack). The primary objective of the study was to evaluate smolts' use of bypass facilities constructed at each dam by PSNH.

This document is currently not available here.

Share

COinS