Loading...
Thumbnail Image
Publication

UMass Amherst Case Studies – Campus Center Plaza & Lederle Graduate Research Center

Citations
Altmetric:
Abstract
This presentation discusses Gale’s recent experience with repair projects at two (2) brutalist structures on the Amherst Campus at UMass. A board-formed concrete retaining wall at the base of the Murray D. Lincoln Campus Center (Marcel Breuer, 1970) was tastefully modified, but retained, as part of a waterproofing replacement project, addressing water infiltration and improving sight lines across the Campus Center Plaza. The panelized precast concrete façades of the John W. Lederle Graduate Research Center (Campbell, Aldrich, & Nulty, 1969) received new exterior sealants, enlarged panel joints, PCB removal and encapsulation, supplemental panel anchorage, and a waterproof coating.
Type
event
event
Date
2021-10-23
Publisher
Degree
Advisors
License
License