Off-campus UMass Amherst users: To download campus access dissertations, please use the following link to log into our proxy server with your UMass Amherst user name and password.

Non-UMass Amherst users: Please talk to your librarian about requesting this dissertation through interlibrary loan.

Dissertations that have an embargo placed on them will not be available to anyone until the embargo expires.

ORCID

https://orcid.org/0000-0002-3423-162X

Access Type

Open Access Thesis

Document Type

thesis

Degree Program

Civil Engineering

Degree Type

Master of Science in Civil Engineering (M.S.C.E.)

Year Degree Awarded

2019

Month Degree Awarded

September

Abstract

Accelerated Bridge Construction (ABC) has gained substantial popularity in new bridge construction and bridge deck replacement because it offers innovative construction techniques that result in time and cost savings when compared to traditional bridge construction practice. One technology commonly implemented in ABC to effectively execute its projects is the use of prefabricated bridge components (precast/prestressed bridge components). Precast/prestressed bridge components are fabricated offsite or near the site and then connected on-site using small volume closure pour connections. Diaphragms are also commonly used to strengthen the connection between certain prefabricated components used in ABC, such as beam elements. Bridges containing closure pour connections and diaphragms can be designed using AASHTO LRFD live-load distribution factor formulas under the condition that the bridge must be sufficiently connected. However, these formulas were developed using analytical models that did not account for the effects of closure pours and diaphragms on live-load distribution. This research study investigates live-load distribution characteristics of precast/prestressed concrete bridges with closure pour connections and diaphragms. The investigation was conducted using finite element bridge models with closure pour joints that were calibrated using experimental data and different configuration of diaphragms. The concrete material used for the closure pour connections was developed as part of a larger project intended to develop high early-strength concrete mixtures that specifically reach strength in only 12 hours, a critical requirement for ABC projects.

DOI

https://doi.org/10.7275/15170455

First Advisor

Sergio Brena

Second Advisor

Kara Peterman

Share

COinS