
Day 2: UMass Amherst
Loading...
DOI
https://doi.org/10.7275/whrq-fe25
Location
UMass Amherst
Event Website
www.umassbrut.org
Start Date
23-10-2021 11:00 AM
End Date
23-10-2021 12:20 PM
Abstract
Although UMass Dartmouth's Science and Engineering Building has long been viewed as an architectural treasure, its aging interior and structure have presented some challenges to users nearly 50 years after it opened. This talk examines Ellenzweig's extensive retrofitting of the UMass Dartmouth SENG building for accessibility, a new envelope, updated MEP, and fire-safety measures. After looking at the design phase and interactions with the Mass Historic Commission, the talk ends with an examination of the replacement of windows in the building.
Included in
Architectural Engineering Commons, Architectural History and Criticism Commons, Architectural Technology Commons, Construction Engineering Commons, Cultural Resource Management and Policy Analysis Commons, Environmental Design Commons, Historic Preservation and Conservation Commons, Interior Architecture Commons
UMass Dartmouth Science and Engineering (SENG) Building Systems Upgrades Project
UMass Amherst
Although UMass Dartmouth's Science and Engineering Building has long been viewed as an architectural treasure, its aging interior and structure have presented some challenges to users nearly 50 years after it opened. This talk examines Ellenzweig's extensive retrofitting of the UMass Dartmouth SENG building for accessibility, a new envelope, updated MEP, and fire-safety measures. After looking at the design phase and interactions with the Mass Historic Commission, the talk ends with an examination of the replacement of windows in the building.
https://scholarworks.umass.edu/umassbrut_community/2021symposium/day_2/6